Complete SMT Solder Paste Operation Process: From Thawing and Printing to Reflow Soldering

A
Take the paste from the refrigerator, let it warm to room temperature while sealed, then open and stir; sample it to check condition before printing. After printing, place components, control dwell time, and send boards into reflow as soon as possible. Set the oven profile per the paste specification and complete soldering. After cooling, run SPI and AOI inspection. Recover leftover paste, cover it, and record the opening time. Control temperature and humidity throughout, keep records, and scrap expired or degraded paste per procedure - tightly control every step.

In the solder paste thawing process, 4 hours of natural thawing at room temperature must be strictly implemented. Using ovens or hot water to accelerate thawing is strictly prohibited, otherwise it will cause flux stratification and abnormal viscosity increase, which will further lead to defects such as printing drawing spikes and insufficient solder. This action applies to all production lines using cryogenically stored solder paste (0℃~10℃). Each line can reduce more than 1200 scrapped boards caused by improper thawing per year. The implementation risk is extremely low, but a thawing time registration form needs to be posted on the refrigerator door and checked by IPQC every shift. The recommended priority is P0; solder paste mixing must use a dedicated centrifugal mixer instead of a manual scraper, with the rotation speed set to 600rpm and the duration set to 90 seconds. If the duration is too short, internal bubbles in the solder paste will not be discharged; if it is too long, flux volatilization will be aggravated. This action is suitable for medium and high-capacity production lines with a daily average paste consumption >3kg. Each line can reduce the attenuation rate of the effective service life of Solder Paste after opening from 35% to 12% per year. The implementation difficulty lies in the switching of operator habits. It is recommended to use a mixing timer for hard locking, and the priority is P0.

The frequency of stencil tension inspection is increased from once a week to once per shift. A tension meter must be used to measure the central area, and only when the tension is ≥35N/cm2 can the stencil be put into use. Insufficient tension will lead to printing deviation and solder bridging, especially for 0201 and 0.4mm pitch QFN devices, where the defect rate increases by up to 4.7 times. This action applies to all production lines using laser-cut stencils with a line change frequency >3 times/day. Each line can reduce about 260 hours of batch rework caused by stencil loosening per year. The implementation risk is the untimely calibration of the tension meter. It is recommended to bind it to the equipment PM plan for synchronous execution, and the priority is P1; the squeegee pressure setting must be dynamically adjusted according to the stencil thickness. The pressure corresponding to a 6mil stencil is 4.2kg, 5mil is 3.8kg, and 4mil is 3.3kg. Excessive pressure will accelerate stencil wear, while insufficient pressure will lead to poor solder paste filling. This action is suitable for all fully automatic printing machines using metal squeegees. Each line can extend the stencil service life from 150,000 cycles to 220,000 cycles per year. The implementation prerequisite is that the accuracy of the equipment pressure sensor needs to be verified regularly, and the priority is P1.

The reflow oven chain speed and temperature profile must be adjusted in linkage according to the substrate thickness. The chain speed for a 1.6mm board is set to 75cm/min, and for a 1.0mm board it must be increased to 92cm/min. Otherwise, the thin board will stay in the high-temperature zone for too long, which will lead to BGA solder ball oxidation and excessive solder joint void rate. This action applies to mixed-line workshops that simultaneously produce PCBs of multiple thicknesses. Each line can reduce the X-ray re-inspection rate of BGA devices from 8.3% to 3.1% per year. The implementation risk is that the process documents are not strongly associated with the ERP BOM thickness field. It is recommended to embed the thickness-chain speed mapping rule in the MES, and the priority is P0; the nitrogen protection concentration is controlled at 200ppm instead of the conventional 50ppm, which can not only meet the brightness requirements of lead-free solder joints, but also reduce nitrogen consumption by 37%. This action is only applicable to production lines equipped with nitrogen generators with a monthly average soldering area >800㎡. Each line can save about 142,000 yuan in nitrogen costs per year. The implementation difficulty lies in the zero drift of the oxygen analyzer. It is recommended to calibrate with standard gas every shift, and the priority is P2.

The effective service time limit after solder paste opening must be controlled by dual factors of temperature and humidity. Under the environment of 25℃/60%RH, it is strictly limited to 12 hours. If the time limit is exceeded, the entire can must be scrapped and cannot be downgraded for use on non-critical single boards. This action applies to small and medium-sized production lines not equipped with an automatic solder paste recycling system. Each line can avoid an increase of 176 hours of rework time caused by missed detection of cold solder joints due to solder paste aging per year. The implementation risk is that employees privately extend the use time. It is recommended to affix a countdown QR code label on the solder paste can and associate it with the MES material requisition time, and the priority is P0; AOI inspection points after placement must eliminate repeated areas of stencil opening shapes. For example, in an array of resistors and capacitors of the same size, only 3 components at the beginning and end are inspected, and the rest are skipped. This action is suitable for bottleneck lines where the AOI inspection cycle is >1.3 times the placement cycle. Each line can increase AOI throughput by 22% per year, which is equivalent to releasing the investment of 1.4 AOI devices. The implementation prerequisite is that SPI data and AOI programs need to share the same coordinate system, and the priority is P1.

Related Articles

Back to List

Recommended Products

LFP-5RNTT-305 Halogen-Free Lead-Free High-Temperature Solder Paste

LFP-5RNTT-305 Halogen-Free Lead-Free High-Temperature Solder Paste

LFP-JJY5RNTT-305 halogen-free lead-free high-temperature solder paste uses standard Sn96.5Ag3.0Cu0.5

LFP-5RTS-305 Halogen-Free Lead-Free High-Temperature Solder Paste

LFP-5RTS-305 Halogen-Free Lead-Free High-Temperature Solder Paste

LFP-JJY5RTS-305T3 QFN-specific halogen-free, lead-free high-temperature solder paste, made from low-

LFP-5RR-305 Zero-Halogen REACH Lead-Free High-Temperature Solder Paste

LFP-5RR-305 Zero-Halogen REACH Lead-Free High-Temperature Solder Paste

LFP-JJY5RR-305 automotive-lamp-specific halogen-free lead-free high-temperature solder paste, made f